S6129Introduced. Formally introduced in its originating chamber and referred for consideration.
Permits structures to remain where the local permitting authority has issued a permit for construction built within a certain erosion hazard area or tidal wetland adjacent area.
Jun 1, 2026: PRINT NUMBER 6129B